Turbocharger bearing housings.
One component family within our drawing-led casting and machining supply scope.

Evaluate the part before the process.
Share your approved drawing, revision and material specification. The review should identify casting suitability, machining datums, critical interfaces and required inspection records.
What the project review covers.
| Area | Required input / scope to agree |
|---|---|
| Material | Your grade and specification; manufacturing suitability confirmed individually. |
| Casting route | Geometry, wall sections and manufacturing route reviewed by the partner. |
| Machining | Drawing datums, bores, interfaces, surface finish and critical characteristics. |
| Inspection | Agreed dimensional checks, material records, cleanliness and other required tests. |
| Tooling and samples | Ownership, cost, approval scope, sample timing and maintenance arrangements. |
| Supply | Order quantities, packing, destination and repeat demand. |
Bearing housing photographs
Product photographs supplied to L Casting. Material grades, model names and manufacturing scope are confirmed separately.
Housings for different cooling and system requirements.
Share your drawing to identify the appropriate product family. Gallery photographs are not assigned to a cooling type or VGT application without model confirmation.
Oil-Cooled Bearing Housings
Bearing housing enquiries for oil-cooled turbocharger applications, reviewed against customer drawings and material specifications.
Water-Cooled Bearing Housings
Housing enquiries for turbocharger applications with water-cooling passages. Interface geometry, material and inspection requirements are reviewed for the project.
VGT Bearing Housings
Bearing housing enquiries for variable geometry turbocharger systems. Supply scope is defined by the approved drawing and application requirements.
Approval, batch control and repeat orders.
Agree the drawing revision, sample acceptance, production inspection and batch identification before release. Repeat orders follow the approved scope; changes require review.
Review production and delivery responsibilities ↗Your drawing. A clear next step.
Prepare the inputs for a capability review and quotation.